
Annular Bop Packing Element Rubber Bop Core for Well Drilling
- Min. Order:
- 1 Piece/Pieces
- Min. Order:
- 1 Piece/Pieces
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Product Description
Product Description
Basic Info.
Processing Service
Moulding, Cutting
Condition
New
Shape
Spherical
Color
Black
Name
Bop Packing Element
Key
Bop Parts
Key2
Rubber Core
Transport Package
Wooden Box
Specification
customized
Trademark
Xinwei
Origin
China
Production Capacity
500 Pair/Pairs Per Month
Product Description
Customized 16A Annular Bop Packing Element Rubber Core for Well Drilling
BOP Type | Bolted and Wedge Cover Models |
Matched BOP Manufacturer | SHAFFER |
Temperature Range | -45 ºC~180ºC |
Certification | API |
Use | Well Drilling |



The product can match and interchange most of domestic BOP manufactories, (such as Shanghai Shenkai, Huabei Rongsheng, Chuanyou Jingkong, Baoji Oil,Jiangsu Xinde, Jiangsu Sanyi, etc). Over the years usage in the oil fields, it has been proved that all the technical requirements and performance of our products can reach the standards of shaffer sealing elements for replacement.
We have a professional technical team.If the size of the product is different from yours.We can design the mold as quickly as possible.
It can be customized according to customers' specific requirements of temperature, pressure and environment conditions.
We have a professional technical team.If the size of the product is different from yours.We can design the mold as quickly as possible.



1. Q: Does the temperature of sealing element can reach -40ºC~ -50ºC?
A: Sure, what's the environment temperature of your working conditions? It's also depends on your storage conditions. Don't put them in open space. When you replace the packing unit, you should let it reach the room temperature, then you can install it. Otherwise, it would crush easily.
2. Q: What's the temperature range of your products?
A: -45ºC~180ºC
3. Q: Which company do you supply for?
A: Our products can match and interchange most of domestic BOP manufactures, such as Goldenman, Dongying Lake, Dongying Jintan,Dongying Robust, Dongying Sino, Shanghai Shenkai, Huabei Rongsheng, Chuanyou Jingkong, Baoshi Drilling, Jiangsu Xinde, Jiangsu Sanyi, Baoji Saifu etc. Over the years usage in the oil fields, It has been proved that all the technical requirements and performance of our products can reach the standard of Shaffer, Hydril, Cameron sealing elements for replacement.
4. Q: Are you factory or Trading Company?
A:We are factory. Our company is specialized in producing bop rubber packer ,such as annular bop packer ,ram bop packer ,shearing ram packer ,vbr ram packer.
5.Q: Handling time for an order
A: Based on order quantity, normally it takes 25 days for production.
Only 2 or 3 days if we have stock on your request size.
6. Q: After Services
A: 1. Our sales team will response for your question within 24 hours (Holidays Excluded).
2. Technical Support will be available in any time.
3. Free replacement will provide once the failure confirmed caused by our product quality.
7. Q: Ports of Shipment
A: Tianjin,Qingdao,Shanghai or other required ports.
2. Q: What's the temperature range of your products?
A: -45ºC~180ºC
3. Q: Which company do you supply for?
A: Our products can match and interchange most of domestic BOP manufactures, such as Goldenman, Dongying Lake, Dongying Jintan,Dongying Robust, Dongying Sino, Shanghai Shenkai, Huabei Rongsheng, Chuanyou Jingkong, Baoshi Drilling, Jiangsu Xinde, Jiangsu Sanyi, Baoji Saifu etc. Over the years usage in the oil fields, It has been proved that all the technical requirements and performance of our products can reach the standard of Shaffer, Hydril, Cameron sealing elements for replacement.
4. Q: Are you factory or Trading Company?
A:We are factory. Our company is specialized in producing bop rubber packer ,such as annular bop packer ,ram bop packer ,shearing ram packer ,vbr ram packer.
5.Q: Handling time for an order
A: Based on order quantity, normally it takes 25 days for production.
Only 2 or 3 days if we have stock on your request size.
6. Q: After Services
A: 1. Our sales team will response for your question within 24 hours (Holidays Excluded).
2. Technical Support will be available in any time.
3. Free replacement will provide once the failure confirmed caused by our product quality.
7. Q: Ports of Shipment
A: Tianjin,Qingdao,Shanghai or other required ports.
Related Keywords
Related Keywords
You May Also Like
You May Also Like