
Rubber Products Cable Car Rubber Wheels
- Min. Order:
- 1 Piece/Pieces
- Min. Order:
- 1 Piece/Pieces
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Product Description
Product Description
Basic Info.
Type
Ropeway Wheel Lining, Ropeway Wheel Liner
Processing Type
Forging
Use
Well Drilling
Certification
ISO 9001
Transport Package
Carton or Wooden Box
Specification
customized
Trademark
XinWei
Origin
China
Production Capacity
50000PCS/Month
Product Description
Rubber Products Cable Car Rubber Wheels
Bracket wheel lining | 385*309*79 |
486*410*79 | |
420*322*93 | |
483*389*98.5 | |
478*385*100 | |
485*385*100 | |
Wheel lining | 388*308*70 |
486*410*79 | |
446*362*72 | |
491*388*79 | |
459.5*355*91.5 | |
545*439.5*107 | |
451*290*87.5 | |
420*318*83 | |
420*318*93 | |
481*381*100 | |
401*318*93 | |
486*410*79 | |
388*308*70 |




Advantage:
High compressive strength
Cold and heat resistant
Wear resistant
Corrosion resistant
impact resistance
High compressive strength
Cold and heat resistant
Wear resistant
Corrosion resistant
impact resistance
We have a professional technical team.If the size of the product is different from yours.We can design the mold as quickly as possible.




2. Q: What's the temperature range of your products?
A: -45ºC-180ºC
3. Q: Which company do you supply for?
A: Our products can match and interchange most of domestic BOP manufactures, such as Goldenman, Dongying Lake, Dongying Jintan, Dongying Robust, Dongying Sino, Shanghai Shenkai, Huabei Rongsheng, Chuanyou Jingkong, Baoshi Drilling, Jiangsu Xinde, Jiangsu Sanyi, Baoji Saifu etc. Over the years usage in the oil fields, It has been proved that all the technical requirements and performance of our products can reach the standard of Shaffer, Hydril, Cameron sealing elements for replacement.
4. Q: Are you factory or Trading Company?
A:We are factory. Our company is specialized in producing bop rubber packer ,such as annular bop packer ,ram bop packer ,shearing ram packer ,vbr ram packer.
5.Q: Handling time for an order
A: Based on order quantity, normally it takes 25 days for production.
Only 2 or 3 days if we have stock on your request size.
6. Q: After Services
A: 1. Our sales team will response for your question within 24 hours (Holidays Excluded).
2. Technical Support will be available in any time.
3. Free replacement will provide once the failure confirmed caused by our product quality.
7. Q: Ports of Shipment
A: Tianjin,Qingdao,Shanghai or other required ports.
A:We are factory. Our company is specialized in producing bop rubber packer ,such as annular bop packer ,ram bop packer ,shearing ram packer ,vbr ram packer.
5.Q: Handling time for an order
A: Based on order quantity, normally it takes 25 days for production.
Only 2 or 3 days if we have stock on your request size.
6. Q: After Services
A: 1. Our sales team will response for your question within 24 hours (Holidays Excluded).
2. Technical Support will be available in any time.
3. Free replacement will provide once the failure confirmed caused by our product quality.
7. Q: Ports of Shipment
A: Tianjin,Qingdao,Shanghai or other required ports.
Related Keywords
Related Keywords
You May Also Like
You May Also Like